Bridge pier formwork for fly-over of Oosterweel Project in Antwerp
Column formwork, support structure as well as column head formwork are made modular to suit all 9 different bridge piers.


Column formwork, support structure as well as column head formwork are made modular to suit all 9 different bridge piers.


These piers are piles of a viaduct without expansion joints.


The new County Hall in Antwerp is a building with 8 completely twisted levels.


Precast or On-Site: which should you choose?


Construx supplies all formwork for flood barrier walls with support buttresses, which are cast on top of concrete slipformed caissons.


Adjustable formwork for a 1000m long curved marina flood barrier wall in Blankenbergh.


Construx supplies formwork for first line flood barriers in Wenduine.


The formwork suits to cast a 125m long curved bridge with a 1370m radius.


For the Mons railway station, Construx supplies a one-off full steel circular shuttering system with round relief.


Formwork for columns, bridge piers and bridge decks for a railway line extension.


This project in Ghent consists of 2 parts.


All piers have the same cross-sectional base and rectangular top.


Construx supplies an arch bridge formwork for several standardised Infrabel bridges.